Article| Image
English
English
|
Deutsch
|
日本語
|
Français
|
Español
Directory Of Year 1980, Issue 5
The current issue
Current Location:English » 19805 » Hydropower Stations and Water Conservancy Projects
Bookmark and ShareCopy Reference Bookmark and Share Add To Favorite

Hydropower Stations and Water Conservancy Projects

Year:1980 Issue:5

Column: EVENTS & TRENDS

Author:

Release Date:1980-02-04

Page: 3-8

Full Text:  

A 500-metre-long water release gate with 27 openings has been basically completed in central China's Hubei Province. This is part of the Gezhouba water conservancy project. At present, 12-metre-wide...

Please login first!
GO TO TOP
5 chegongzhuang Xilu, P.O.Box 399-T, Beijing, China, 100048
Tel: +86 10 68413030
Fax: +86 10 68412023
Email: cmjservice@mail.cibtc.com.cn
0.031